Stable wastewater treatment thanks to monthly monitoring
- Client
- AZ Maria Middelares, Ghent
- Sector
- Healthcare
- Services
- Key figure
- Monthly, independent monitoring of the treatment plant
The challenge
The hospital has its own wastewater treatment plant. The technical department wanted to focus on maintenance, with the certainty that the treatment plant operates stably and in compliance.
What we did
- Monthly analysis of influent, effluent and sludge
- Evaluation of the entire treatment process
- Advice when operation needs to be adjusted
Results
- Stable treatment performance, independently monitored
- Timely adjustment, before problems arise
- The technical department can focus on core maintenance
More references
UZ Gent
Up to 64% of make-up water from rainwater
Rainwater from an existing buffer replaces groundwater and mains water in the cooling towers and steam boilers of a university hospital.
Love Tomorrow (Tomorrowland)
Water footprint tracked per edition
A major festival measures its water footprint, sets out actions and tracks the results, edition after edition.
Mutete school campus, Rwanda
100% of the school's demand met by rainwater in an average year
Rainwater as a drinking water source for a school campus with more than 2,200 pupils.
Facing a similar challenge?
Tell us about your site and we'll show you what's possible.