Skip to content
Logistics

Producing drinking water from rainwater to become fully self-sufficient

Client
Montea Lummen
Sector
Logistics
Key figure
100% water self-sufficiency feasible

The challenge

Montea's 30,000 m² carbon-free logistics development in Lummen aimed for complete water self-sufficiency. Rainwater would supply all non-potable and potable needs, making the site independent from the drinking-water network.

What we did

  • Rainwater capture capacity assessment and buffer dimensioning
  • Design of a multi-barrier drinking-water installation from rainwater
  • Good practices for rainwater capture (prefilters, leaf catchers, etc.)
  • Economic assessment: investment versus tap-water savings

Results

  • 100% water self-sufficiency feasible from rainwater alone
  • Drinking-water installation designed: filtration, activated carbon, UF, LED-UV
  • Estimated consumption of 5 m³/day for drinking water
  • ROI estimated at 16 to 17 years, improving as technology matures

Facing a similar challenge?

Tell us about your site and we'll show you what's possible.

Contact us now

Some cookies are needed to make this website work. With your consent, we also use other cookies: statistics. You choose, and you can change your choice at any time. Cookie policy