Overflows reduced from 19 to 1 in the simulation

The challenge

Aurubis Olen produces copper anodes, cathodes, wire and profiles. The site wanted to depend less on tower and canal water, avoid emergency discharges during heavy rain and prepare the sewer system for an expansion.

What we did

  • Water balance identifying missing data, with a proposal for additional meters
  • Rainwater simulation over six years and a disconnection plan with reuse in cooling towers and sprinkler systems
  • Reuse of industrial wastewater: four technology routes, infrastructure plan, CAPEX and Water-as-a-Service
  • Sizing of an influent buffer using four methods, including climate scenarios
  • Hydraulic study of the sewer system and design for the expansion

Results

  • UF with CCRO can cover the full demand of 361,413 m³ of tower and canal water per year with the site's own effluent
  • A rainwater buffer of 5,500 m³ covers 100% of the sprinkler water (22,175 m³ per year)
  • An influent buffer of ± 5,000 m³ reduces overflows in the simulation from 19 to 1
  • Bottlenecks in the sewer system located, with cost estimates for an additional main collector